Haverhill Line
Regional Rail
For more information, visit https://www.mbta.com/schedules/CR-Haverhill.
Current Service Alerts
Haverhill Line Train 285 (9:40 pm from North Station) is operating 20-30 minutes behind schedule between Lawrence and Bradford.
Affected direction: Outbound
Oak Grove Escalator 105 (Commuter Rail platform to unpaid lobby) unavailable
Commuter Rail train service is suspended at Haverhill station through Summer 2025 to allow for work on the South Elm Street Bridge. An accessible van operates between Haverhill and Bradford.
Built in 1906, the South Elm Bridge is beyond its useful life and ready to be replaced. Using accelerated bridge construction techniques to reduce customer and traffic impacts, the MBTA will replace the nearly-120-year-old bridge with a modern single-span structure with a useful life of 75 years. The new structure will include a ballasted steel deck, which means a smoother ride for passengers. The MBTA will also perform roadway, sidewalk, and drainage improvements along South Elm Street.
Recently Resolved Service Alerts
Haverhill Line Train 266 (5:32 pm from Bradford) is operating 5-15 minutes behind schedule between North Wilmington and North Station.
Affected direction: Inbound
Stations Served
This route stops at Anderson/Woburn, Andover, Ballardvale, Bradford, Greenwood, Haverhill, Lawrence, Malden Center, Melrose Highlands, Melrose/Cedar Park, North Station, North Wilmington, Oak Grove, Reading, Wakefield and Wyoming Hill.
🚆 If you want instant notifications of service alerts on this or any other route, you need Mobility Bot!
Stay informed with real-time transit alerts tailored to your specific routes and schedule, delivered only on the days you commute.
Install it now in your Slack workspace.
Mobility Bot utilizes data provided by Transitland.
MBTA data is provided by MassDOT.