Fall River/New Bedford Line
Regional Rail
For more information, visit https://www.mbta.com/schedules/CR-NewBedford.
Current Service Alerts
Fall River Line Train 1936 (4:41 pm from Fall River Depot) is operating 5-15 minutes behind schedule between East Taunton and South Station.
Affected direction: Inbound
South Station Pedal & Park is closed due to construction. Bicycle racks are currently available on Atlantic Ave adjacent to the South Station main entrance.
🚧
Elevator #779 from the pedestrian bridge to the platform is temporarily out of service at East Taunton until further notice. Please use the accessible ramp for access to the platform.
The Riverside Ave entrance at Campello Station is currently closed. Passengers may continue to use the Plain St entrance.
Affected lines: Fall River/New Bedford Line
Recently Resolved Service Alerts
Fall River Line Train 1925 (3:38 pm from South Station) is operating 5-15 minutes behind schedule between Bridgewater and Fall River.
Affected direction: Outbound
New Bedford Line Train 2021 (2:20 pm from South Station) is operating 5-15 minutes behind schedule between Campello and New Bedford due to train traffic.
Affected direction: Outbound
New Bedford Line Train 2030 (2:04 pm from New Bedford) is operating 5-15 minutes behind schedule between Campello and South Station.
Affected direction: Inbound
Stations Served
This route stops at Braintree, Bridgewater, Brockton, Campello, Church Street, East Taunton, Fall River Depot, Freetown, Holbrook/Randolph, JFK/UMass, Middleborough, Montello, New Bedford, Quincy Center and South Station.
🚆 If you want instant notifications of service alerts on this or any other route, you need Mobility Bot!
Stay informed with real-time transit alerts tailored to your specific routes and schedule, delivered only on the days you commute.
Install it now in your Slack workspace.
Mobility Bot utilizes data provided by Transitland.
MBTA data is provided by MassDOT.